WB29-ALB-ENE-01: Feasibility Study and ESIA for new 400 kV OHTL Fier (Albania) – Arachtos (Greece)

WB29-ALB-ENE-01: Feasibility Study and ESIA for new 400 kV OHTL Fier (Albania) – Arachtos (Greece) The Project consists of building a new 400kV overhead transmission line from substation Fier (Albania) to the border with Greece. The OHL route length estimation from substation Fier (Albania) to the border with Greece is approximately 125 km and lies in the western and southern regions of Albania. Services: Technical assessment of project elements; Selection of the optimal variant for the 400kV overhead line route of line and terminal points (border point and SS Fier); Feasibility Study;

Consultancy services related to the development of a technical solution for the connection of the future wind farm Rakova Bara to the power system of Serbia

Consultancy services related to the development of a technical solution for the connection of the future wind farm Rakova Bara to the power system of Serbia for the purposes of early public consultations and spatial planning development. The grid connection consists of the following components: 400kV OHL for connecting the new 400kV SWY Kučevo to the existing OHL no. 401 /2 SWY Drmno – HPP Djerdap 1 (LI/LO); Development of a proposal for the location and orientation of the future 33/400kV SS Rakova Bara and 400kV SWY Kučevo; Proposal of 400kV transmission line corridors and 33kV internal lines; Services: Technical […]

Montenegro, Albania – MNE-ALB new transmission line and existing B&H-MNE-ALB transmission line rehabilitation

Montenegro, Albania – MNE-ALB new transmission line and existing B&H-MNE-ALB transmission line rehabilitation, Feasibility study The Project is consisted of two parts: Part 1: Construction of a new 110 kV line between Montenegro (Ulcinj) and Albania (Velipojë), including construction of necessary 110/x kV substations; Part 2: Rehabilitation of existing 220 kV lines Trebinje (B&H) – Perućica (ME) – Podgorica (ME) – Vau Dejës (AL). Services: Technical Assessment of alternative solutions for both parts; Conceptual Design in line with Montenegrin legislation; ESIA according to EBRD guidelines.

Windfarm Kostolac (66MW) – design review of Design for Construction Permit for construction of windfarm (civil part, wind turbine pole)

Windfarm Kostolac (66MW) – design review of Design for Construction Permit for construction of windfarm (civil part, wind turbine pole) Design review services refer to the Design for Construction permit for construction of new 66MW windfarm in the Municipality of Kostolac Serbia. The subject design comprised only civil part (towers). Services: Technical review of the design; Consultations with the designer and certification of design for application for construction permit;

Design of PV Plant Dubrovsko in the municipality of Šavnik (Montenegro)

Design of PV Plant Dubrovsko in the municipality of Šavnik (Montenegro), with grid connection details The project consists of 3 (three) components: PV Plant, approx. 200MW AC, 2x110kV OHL connection from new SS Dubrovsko to 400/110/35 kV SS Brezna, New Substation Dubrovsko. Services: Conceptual solution of PV Plant, including update of feasibility study; Preparation of Design Terms of References; Preparation of Preliminary Design for all components; Communication with Montenegrin TSO in reference to grid connection; Preparation of relevant documentation for provision of construction permit; Other consultancy and advisory services.

WB29-SRB-ENE-01 – Central-Balkan Corridor: Pre-feasibility Study and Strategic Environmental Assessment (SEA)

WB29-SRB-ENE-01 – Central-Balkan Corridor: Pre-feasibility Study and Strategic Environmental Assessment (SEA) Subproject includes 2 sections, consisting of a number of components: Section I: New 400/110 kV substation Požarevac 3; New 2×400 kV OHL SS Požarevac 3 – SS Jagodina 4; Section II: New 400 kV interconnection OHL between Serbia and Bulgaria; Upgrade of the existing substation Kruševac 1 from 220/110 kV to 400 kV; New 400 kV OHL SS Niš 2 (or SS Leskovac 2) – SS Kraljevo 3, via upgraded substation SS Kruševac 1; Upgrade of the existing SS Požega from 220/110 kV to 400kV; New 400 kV OHL […]

Design documentation for the construction of 110 kV OHL SS Tutin – SS Prijepolje (approx. length 100km)

Design documentation for the construction of 110 kV OHL SS Tutin – SS Prijepolje (approx. length 100km) The project includes the complete process of development of the new infrastructure project, from the initial studies to the Design for Construction. Services: Route of line selection study; Conceptual Design; Preliminary Design; Expropriation studies; Fire protection studies; Geotechnical works and related studies; EIA / ESIA Reports Design for Construction Permit; Design for Construction.

Consultancy services related to “BEOGRID” power network development project

Consultancy services related to “BEOGRID” power network development project The project comprises construction of the following grid infrastructure: SS 400/110kV Belgrade 50 2×400 kV transmission line SS Belgrade 50 – SWY Čibuk 1 with equipping of 400 kV bays at Chibuk 1 (approx 85km) Two 400 kV transmission lines for the lead-in of 400kV OHL no. 450 (SWY Mladost – SS Novi Sad 3) into SS Belgrade 50 (approx 24km) Two double-circuit 110 kV transmission lines for the lead-in of OHL no.104 /8 (TS Stara Pazova – SS Indjija 2) into SS Belgrade 50 (approx 25km) Two double-circuit 110 kV […]

Supervision of the construction works (civil part) on the construction of the solar power plant „Salaš Crnobarski“

Supervision of the construction works (civil part) on the construction of the solar power plant „Salaš Crnobarski“, with the following components / clusters: PV Plant SC 001, cadaster parcel 6998 PV Plant SC 002 cadaster parcel 6996/32 PV Plant SC 003 cadaster parcel 6996/32 Services: Checking of technical documentation for construction works; Supervision of construction works (civil structures);