Design documentation for the construction of 110 kV OHL SS Tutin – SS Prijepolje (approx. length 100km)
The project includes the complete process of development of the new infrastructure project, from the initial studies to the Design for Construction.
Services:
- Route of line selection study;
- Conceptual Design;
- Preliminary Design;
- Expropriation studies;
- Fire protection studies;
- Geotechnical works and related studies;
- EIA / ESIA Reports
- Design for Construction Permit;
- Design for Construction.