WB29-SRB-ENE-01 – Central-Balkan Corridor: Pre-feasibility Study and Strategic Environmental Assessment (SEA)

WB29-SRB-ENE-01 – Central-Balkan Corridor: Pre-feasibility Study and Strategic Environmental Assessment (SEA)

Subproject includes 2 sections, consisting of a number of components:

Section I:

  • New 400/110 kV substation Požarevac 3;
  • New 2×400 kV OHL SS Požarevac 3 – SS Jagodina 4;

Section II:

  • New 400 kV interconnection OHL between Serbia and Bulgaria;
  • Upgrade of the existing substation Kruševac 1 from 220/110 kV to 400 kV;
  • New 400 kV OHL SS Niš 2 (or SS Leskovac 2) – SS Kraljevo 3, via upgraded substation SS Kruševac 1;
  • Upgrade of the existing SS Požega from 220/110 kV to 400kV;
  • New 400 kV OHL SS Kraljevo 3 – SS Požega;
  • New 2×400 kV OHL SS Požega – Vardište;

Services:

  • Project management (project team leader);
  • Technical assessment of project elements;
  • Selection of the optimal variant for component 2;
  • Feasibility Study;