Design documentation for the construction of 110 kV OHL for connection of new SWY Veliki Krivelj 2 and SWY Bor 5

Design documentation for the construction of 110 kV OHL for connection of new SWY Veliki Krivelj 2 and SWY Bor 5. The project includes to construction of the following transmission lines (total lengths approx. 25km): 2x110kV OHL SS Bor 6 – SWY Bor 5 2x110kV OHL SS Bor 2– SWY Bor 5 2x110kV OHL SS Bor 2 – SWY Veliki Krivelj 2 2x110kV OHL SS Bor 6 – SWY Veliki Krivelj 2 Services: Route of line selection study; Conceptual Design; Preliminary Design; ESIA Reports; Tender Documents / Tech.Specs; Design for Construction Permit; Design for Construction; Supervision of construction works.

Simandou Mine Project, Guinea / Design of 35kV Overhead Lines

Simandou Mine Project, Guinea / Design of 35kV Overhead Lines The services comprise consulting and design services related to 35kV overhead line within the planned Simandou Mine Project in Guinea. Total approximate length of all lines is 13.5km. Services: Inception stage – preparation of design data specification and initial clarifications with the main Contractor and Client; Preparation of general project concept and specifications of parameters and equipment; Conceptual design of Overhead Lines, including outline and structural calculation of poles and foundations, profile drawings, specification of equipment, Bill of Material (BoM).

Solar Power Plant “KIMA” – Grid Connection

Solar Power Plant “KIMA” – Grid Connection Preparation of the design documents for the following components of the grid connection: New 110kV Switchyard (SWY) “KIMA” New 110kV OHL for connection of new 110kV SWY to existing 110 kV OHL No. 189 Novi Pazar – Sjenica, as a “lead-in / lead-out” connection (approx. 2x4km) Reconstruction of existing 110kV OHL no. 189 from the point of connection to SWY KIMA to SS Novi Pazar Services: Route of line selection study (OHL); Study on scope of reconstruction of existing line (with analysis of technical alternatives); Conceptual Design (IDR) of all facilities; Preliminary Design […]

Solar Power Plant “KIMA” – 110kV Substation

Solar Power Plant “KIMA” – 110kV Substation Preparation of the design documents for the new 33/110kV Substation “KIMA” for the new solar (PV) power plant, including road connection. Services: Conceptual design (IDR); Preliminary design (IDP).

DON – Project in the Netherlands, consisting of five components

DON – Project in the Netherlands, consisting of five components: Cabling of 110 kV OHL Meppel – Steenwijk in front of the future SS MPN 110; Cabling of 110 kV OHL Harculo – Weteringkade – at portal tower no. 19 (HCL110); Cabling of 110 kV OHL Dedemsvaart (DDV110); Reconstruction of 220kV OHL Hessenweg – Hoogeveen in front of 220/110kV SS Hessenweg; Reconstruction of 110kV OHL Hoogeven Riegmeer (HGR 110) – cabling of overhead section in span 17-18 on 110kV OHL Hoogeveen – Dedemsvaart and Hoogeveen – Hardenberg. Services: Conceptual solution with analysis of alternatives; Structural checks of structures; Detailed design […]

PR 010749, Montenegro – Preliminary Design for CGES – SS Brezna

PR 010749, Montenegro – Preliminary Design for CGES – SS Brezna Update of Preliminary Design of SS 400/110/35kV Brezna (II Phase), considering the newly implemented geotechnical investigation works and Study on geotechnical condition for construction of substation. Services: Review of previously prepared Preliminary design (IDP); Update of IDP.

Design documentation for the construction of 400 kV OHL for connection of SS 400/110 kV Bor 6 to the Serbian power network

Design documentation for the construction of 400 kV OHL for connection of SS 400/110 kV Bor 6 to the Serbian power network. The project includes: 400 kV OHL SWY Đerdap 1 – SS Bor 6 (approximate length 41 km) 400 kV OHL SS Bor 2 – SWY Drmno (approximate length 58 km) Services: Route of line selection study; Conceptual Design; Preliminary Design; ESIA Reports; Tender Documents / Tech.Specs; Design for Construction Permit; Design for Construction.

Windfarms Kula 2, Kula 3, Kula 4 – change of Design for Construction Permit for construction of windfarms (electrical part) and preparation of Design for Construction

Windfarms Kula 2, Kula 3, Kula 4 – change of Design for Construction Permit for construction of windfarms (electrical part) and preparation of Design for Construction Review of the Design for Construction permit for construction of new windfarms, each with 10MW capacity, The design consists of electrical part (wind turbine internal installations, 20kV switchgear, transformer, MV network, monitoring and supervision), TK and mechanical part. Services: Design for Construction Permit Design for Construction

Preparation of technical documentation for reconstruction of existing 110kV OHL

Preparation of technical documentation for reconstruction of existing 110kV OHL: 110kV OHL no.113/2 Niš 2 – Leskovac 4 (47.5 km) 110kV OHL no.113/4 Leskovac 2 – EVP Grdelica (12.1 km) 110kV OHL no.113/5 HPP Vrla 3 – EVP Grdelica (34.3 km) Services: Update of Conceptual Design; Preliminary Design for provision of construction permit; ESIA Study, with site investigations and measurements; Design for Construction.