Solar Power Plant “KIMA” – Grid Connection

Solar Power Plant “KIMA” – Grid Connection

Preparation of the design documents for the following components of the grid connection:

  1. New 110kV Switchyard (SWY) “KIMA”
  2. New 110kV OHL for connection of new 110kV SWY to existing 110 kV OHL No. 189 Novi Pazar – Sjenica, as a “lead-in / lead-out” connection (approx. 2x4km)
  3. Reconstruction of existing 110kV OHL no. 189 from the point of connection to SWY KIMA to SS Novi Pazar

Services:

  • Route of line selection study (OHL);
  • Study on scope of reconstruction of existing line (with analysis of technical alternatives);
  • Conceptual Design (IDR) of all facilities;
  • Preliminary Design (IDP) of all facilities.