Windfarms Kula 2, Kula 3, Kula 4 – change of Design for Construction Permit for construction of windfarms (electrical part) and preparation of Design for Construction
Review of the Design for Construction permit for construction of new windfarms, each with 10MW capacity, The design consists of electrical part (wind turbine internal installations, 20kV switchgear, transformer, MV network, monitoring and supervision), TK and mechanical part.
Services:
- Design for Construction Permit
- Design for Construction