Design documentation for the construction of 110 kV OHL for connection of new SWY Veliki Krivelj 2 and SWY Bor 5.
The project includes to construction of the following transmission lines (total lengths approx. 25km):
- 2x110kV OHL SS Bor 6 – SWY Bor 5
- 2x110kV OHL SS Bor 2– SWY Bor 5
- 2x110kV OHL SS Bor 2 – SWY Veliki Krivelj 2
- 2x110kV OHL SS Bor 6 – SWY Veliki Krivelj 2
Services:
- Route of line selection study;
- Conceptual Design;
- Preliminary Design;
- ESIA Reports;
- Tender Documents / Tech.Specs;
- Design for Construction Permit;
- Design for Construction;
- Supervision of construction works.