Design documentation for the construction of 400 kV OHL for connection of SS 400/110 kV Bor 6 to the Serbian power network.
The project includes:
- 400 kV OHL SWY Đerdap 1 – SS Bor 6 (approximate length 41 km)
- 400 kV OHL SS Bor 2 – SWY Drmno (approximate length 58 km)
Services:
- Route of line selection study;
- Conceptual Design;
- Preliminary Design;
- ESIA Reports;
- Tender Documents / Tech.Specs;
- Design for Construction Permit;
- Design for Construction.