WB21-SRB-ENE-01 – Serbia, North CSE corridor, new 400/110 kV Belgrade West Substation and OHL 400 kV Serbia-Romania: Pre-Feasibility Study including Conceptual Design and Preliminary ESIA
Subproject includes 3 components:
1. Substation (SS) 400/110 kV Belgrade West with the alignment of the 400 kV and 110 kV OHLs
2. 400 kV OHL SS Belgrade West – WPP Čibuk 1 (app. 80 km)
3. Upgrade of existing OHL 400 kV Serbia (HPP Djerdap 1) – Romania (Portile de Fier) to double-circuit OHL (app 2 km)
Services:
• Project management (project team leader)
• Development of OHL corridor alternatives and technical assessment
• Development of alternative SS locations and technical assessment
• Comparison of project options and Multi Criteria Assessment (MCA)
• Pre-Feasibility Study
• Conceptual design of OHL and SS – Serbian legislation