Srp / Eng 

Technical review of designs for connection of new factory Linglong to the power system of Serbia

Technical review of designs for connection of new factory Linglong to the power system of Serbia:

  1. 110 kV OHL no. 1007 SS Zrenjanin 2 – TETO Zrenjanin, lead-in into SWY 110 kV Zrenjanin;
  2. Two underground cable lines 110 kV SS Linglong – SWY Zrenjanin;
  3. Connection Switchyard (PRP) 110 kV Zrenjanin

Services:

  • Technical review of design documentation;
  • Issue of review reports and certification for issue of construction permits;