Technical Inspection of works on HV underground cable lines (110kV) during the construction works and upon commissioning.
Finalized and ongoing projects:
• 110kV U/G cable SS Kruševac 1 – SS Kruševac 3
• 110kV U/G cable SS Beograd 17 – SS Beograd 23 “Autokomanda”
• 110kV U/G cable SS Beograd 23 – SS Beograd 45
• 110kV U/G cable SS Beograd 45 – TETO Beograd
Services:
• Technical inspection, according to legislation of Serbia
• Checking of quality of works, as per approved design documentation, during the duration of works (electrical, civil, telecommunication)
• Checking of necessary design documentation, construction logs, certificates and testing documentation
• Checking of compliance of erected material and equipment with tech. documentation