Technical Inspection of executed works on power facilities built as part of the implementation of the wind farm project “Krivača” in the vicinity of Golubac

Technical Inspection of executed works on power facilities built as part of the implementation of the wind farm project “Krivača” in the vicinity of Golubac.

Technical inspection of works during the construction works and upon commissioning, including:

  1. Substation 33/110 kV – SS Krivača
  2. Connection switchgear 110 kV – PRP
  3. SS Veliko Gradište (one line bay)
  4. SS Neresnica (one line bay)
  5. Connection of 10 kV cable for auxiliary consumption (about 320m)
  6. 110kV OHL SS Krivača – SS V. Gradište (19 km)
  7. 110kV OHL SS Krivača – SS Neresnica (19 km)

Services:

  • Technical inspection, according to legislation of Serbia;
  • Checking of quality of works, as per approved design documentation (electrical, civil, telecommunication, HVAC, architecture, access roads, hydrotechnical installations);
  • Checking of necessary design documentation, construction logs, certificates and testing documentation;
  • Checking of compliance of erected material and equipment with tech.documentation;
  • Issue of certificate for putting substations into operation and for issue of operation permit.