Srp / Eng 

Preparation of technical documentation for 110kV OHL (three sub-projects)

Preparation of technical documentation for 110kV OHL (three sub-projects)

  1. Construction of 110 kV OHL no. 1153 SS Pančevo 2 – SS Belgrade 7, lead-in into SS Belgrade 46 (Zbeg)
  2. Adaptation of existing 110 kV OHL no. 137/2 EVP Resnik – TPP Kolubara
  3. Adaptation of existing 110 kV OHL no. 132/3 SS Kula – SS Srbobran

Services:

  • Route of line selection study (comp.1);
  • Conceptual Design;
  • Preliminary Design;
  • ESIA Study
  • Design for Construction Permit;
  • Design for Construction