Preliminary design of medium voltage cable line 20kV KV (first and second stage) and Concrete Prefabricated Substation 10(20)/0.4 kV for CS “Pesak” on “Nadela” channel for irrigation system “PP Economy”
Preliminary design of medium voltage cable line 20kV KV (first and second stage) and Concrete Prefabricated Substation 10(20)/0.4 kV for CS “Pesak” on “Nadela” channel for irrigation system “PP Economy”