Highway E-70/E-75, Belgrade Ring Road, Dobanovci – Bubanj Potok, Section 6
Preliminary and Detailed Design of follwoing facilities:
– Reconstruction of overhead transmission lines: OHL 110kV (No. 137/1 and No.101 AB/1), OHL 220kV (No.213/2, No.204 and No.252) and OHL 400kV (OHL. 412), on road crossinges and relevant sections,
– Public lighting installation,
– Power supply infrustracture (SS 10/0.4kV, OHL 10kV),
– Reconstruction of telecommunication cables,
– Installations in Tunnel “Beli Potok”: Electromechanical installations (ventilation) and telecommunication installataions
– Fire protection and alarm system