Feasibility Study and Preliminary Design – Electricity network expansion for the development of RES Energy
The project consists of the three elements:
1) 110 kV OHL Vilusi – Herceg Novi
2) Phase 1 of SS Brezna (110kV), including lead-in of 110kV OHLs
3) Phase 1 of SS Brezna (400kV), including lead-in of 400kV OHL – connection to 400kV OHL Lastva – Čevo
Services (OHL part):
• 110kV and 400kV OHL line routing: Preliminary and Alignment Survey of OHL corridors, assessment of alternatives;
• Technical Assessment (OHL) as per EBRD requirements;
• Preparation of Preliminary Design documents for 110kV line and 400kV lead-ins as per MNE legislation;
• Project Implementation Plan;