110kV OHL No. 148/2 SS Bor 2 – SS Zaječar 2. Lead-in into 110kV SWY Bor 4 for supply of new mining complex.

110kV OHL No. 148/2 SS Bor 2 – SS Zaječar 2. Lead-in into 110kV SWY Bor 4 for supply of new mining complex.
Preparation of design documentation and support to the Client in preparation of general documentation (Terms of References)

Contract No.1 (12.2018 – 04.2019)
• Route of line selection study;
• Conceptual Design;
Contract No.2 (07.2019 – 06.2021)
• Conceptual Design – update;
• Preliminary Design;
• Tender Documents / Tech.Specs
Contract No.3 (10.2019 – 06.2021)
• Design for Construction Permit;
• Design for Construction;
• Supevision of construction works
• Consultancy services / project management