Srp / Eng 

110kV OHL No. 107/2, lead-in into SS Ub, length approx. 10km. Preparation of design documentation from selection of the route line to Design for Construction and assistance to the Client in the process of provision of consents and permits.

110kV OHL No. 107/2, lead-in into SS Ub, length approx. 10km. Preparation of design documentation from selection of the route line to Design for Construction and assistance to the Client in the process of provision of consents and permits.

Services:
• Route of line selection study;
• FS with the Preliminary Design;
• EIA Study;
• Crossing and other relevant studies;
• Design for Construction Permit;
• Expropriation study;
• Design for Construction;
• Tower design;